The project “Preparation of necessary Documentation for River Training and Dredging Works on selected locations along the Danube River” is 100% financed by the EU within the “IPA 2010“ program. The implementation of the project officially started in May 2011 and lasted till 2014 .
The aim of the project was to prepare the necessary technical and tender documentation so that hydro technical works for the improvement of navigation safety on the Danube River can commence.
The beneficiaries of this project are the Ministry of Construction, Transport and Infrastructure and the Directorate for Inland Waterways.