print


04.07.2019.

The new layout of the critical sector Futog and updated ENC cell of the Danube River are available on the website of the Directorate for Inland Waterways.

In May 2019, the Directorate for Inland Waterways has conducted an additional hydrographic survey of the critical sector Futog (km 1,267.4 – km 1,261.6) on the Danube River. The new layout of the critical sector Futog, including available depths with reference to the low navigational level, can be downloaded from the internet presentation of Plovput, in PDF format. The fairway has been changed along the whole critical sector and the marking system has been adjusted. Therefore, this sector, for years the most critical for navigation on the Danube in Serbia, has been recording positive changes enabling the widening of the fairway from 80 m to 120 m.



Beside the new layout, the Directorate for Inland Waterways has prepared and published the new cell of Electronic Navigational Chart of the Danube River containing the stretch of the critical sector Futog, in Inland ECDIS standard 2.3. The new cell of Electronic Navigational Chart contains data on available waterway depths at this sector, based on the latest results of hydrographic survey conducted in May 2019 and with reference to the low navigational level, the relocated position of the fairway and up-to-date system of waterway marking, as well as the data on available depths within the winter shelter Novi Sad, accordingly to the latest hydrographic survey of this winter shelter). The updated cell is available at: www.plovput.rs/electronic-navigational-charts.

For dynamic data on the available depths of the fairway on the critical sectors, please visit the Navigational Bulletin, a service for providing current dynamic information on waterways in the Republic of Serbia where international and interstate navigation regimes apply (the Danube, Sava and Tisa Rivers). This service is available in Serbian, English, German and French (www.plovput.rs/navigational-bulletin).


Nazad



Keywords:
futog, critical, sector


Related news:

28.11.2019 The new layout of the critical sector Futog
04.12.2018 New Electronic Navigational Charts for the Sava River
06.12.2018 New layouts of the critical sectors on the Sava River
13.12.2018 Plovput published Navigational Chart of the Tisza River
27.12.2018 Plovput published Navigational Chart of the Danube River
24.12.2018 New Electronic Navigational Charts for the Danube River
17.06.2019 Plovput published the new edition of the Danube River Navigational Char
04.07.2019 Changes of available dimensions and dislocation of the fairway on the critical sector Futog
08.11.2019 Study visit of students of the Faculty of Transport
04.12.2018 Plovput published Navigational Chart of the Sava River adjusted for printing in A4 format
30.12.2019 Plovput published Navigational Chart of the Sava River
30.12.2019 Plovput published Navigational Chart of the Tisza River
30.12.2019 New Electronic Navigational Charts for the Sava River
30.12.2020 Plovput published the new edition of the Danube River Navigational Chart
30.12.2020 Plovput published Navigational Chart of the Sava River
30.12.2020 New Electronic Navigational Charts for the Danube River
30.12.2020 New Electronic Navigational Charts for the Sava River
23.11.2015 New Electronic Navigational Charts for the Danube River
07.11.2018 Study visit of the cadets of the Military Academy of the University of Defence
13.09.2018 Beginning of the works execution under the project "River Training and Dredging Works on critical sectors on the Danube River"
06.08.2018 Changes of available dimensions and dislocation of the fairway on the critical sector Futog
22.05.2018 Changes of available dimensions and dislocation of the fairway on the critical sector Futog
25.12.2017 Relocation of the fairway at the Futog critical sector
03.11.2017 With the sediment dredging navigation conditions at critical sector Kamičak on the Sava River enhanced
14.07.2017 New Electronic Navigational Charts for the Sava River
14.07.2017 Plovput published Navigational Chart of the Sava River adjusted for printing
12.06.2017 Changes of available dimensions and dislocation of the fairway on the critical sector Futog
09.12.2016 New functionality of Navigational Bulletin available to waterway users
17.09.2016 New Electronic Navigational Charts for the Sava River
13.09.2016 At critical sector Futog fairway dislocated and narrowed
03.08.2016 Plovput published new situational plans of critical sectors for navigation on the Sava River
22.03.2016 Plovput published second edition of navigational chart for the Danube River
01.03.2016 Plovput published new Electronic Navigational Charts for the Sava River

RSSPlovput FacebookPlovput TwitterPlovput InstagramPlovput Youtube


download documents

Informer

Photo Gallery

newsletter



Stakeholders' Forum

Danube Glossary 2019




Danube Stream