print


03.08.2016.

New situational plans are designed based on results of hydrographic survey conducted in period May – June 2016. Dislocation and narrowing of the fairway was performed, in accordance with available depths



In period May-June 2016, Directorate for Inland Waterways has conducted hydrographic survey of the Sava River, including survey on critical sectors for navigation. New situational plans of critical sectors Kamičak, Šabac, Klenak, Sremska Mitrovica and Ušće Drine, with available depth compared to low navigation level, may be downloaded from the Internet presentation of Plovput and from Navigational Bulletin, in pdf.



On critical sector Kamičak (km 88.2 – km 82.2) dislocation and narrowing of the fairway was performed, in accordance with available depths. On critical sector Klenak (km 112.6 – km 106.0) adjustment of position of the fairway was conducted, without its construction. Critical sector Ušće Drine remains the most critical sector for navigation on the Sava River in the Republic of Serbia, in terms of available depth and width of fairway. For more information, please visit the Internet presentation of Directorate for Inland Waterways. For dynamic information on fairway and navigation conditions on the Sava River, please visit Navigational Bulletin.


Nazad



Keywords:
Sava, critical, sectors


Related news:

12.02.2010 Plovput at GIS Forum Danube Held in Vienna
02.10.2009 Plovput Finished the Sava River Marking Campaign for 2009
14.10.2009 Serbia and Croatia Signed Bilateral Agreement on Navigation and IWW
04.12.2018 Plovput published Navigational Chart of the Sava River adjusted for printing in A4 format
30.12.2020 New Electronic Navigational Charts for the Sava River
04.12.2018 New Electronic Navigational Charts for the Sava River
06.12.2018 New layouts of the critical sectors on the Sava River
13.12.2018 Plovput published Navigational Chart of the Tisza River
27.12.2018 Plovput published Navigational Chart of the Danube River
24.12.2018 New Electronic Navigational Charts for the Danube River
14.06.2019 New edition - Atlas of Berths for Danube, Sava and Tisza
17.06.2019 Plovput published the new edition of the Danube River Navigational Char
04.07.2019 Changes of available dimensions and dislocation of the fairway on the critical sector Futog
08.11.2019 Study visit of students of the Faculty of Transport
28.11.2019 The new layout of the critical sector Futog
30.12.2019 Plovput published Navigational Chart of the Sava River
30.12.2019 Plovput published Navigational Chart of the Tisza River
30.12.2019 New Electronic Navigational Charts for the Sava River
30.12.2020 Plovput published the new edition of the Danube River Navigational Chart
30.12.2020 Plovput published Navigational Chart of the Sava River
30.12.2020 New Electronic Navigational Charts for the Danube River
12.06.2017 Changes of available dimensions and dislocation of the fairway on the critical sector Futog
23.11.2015 New Electronic Navigational Charts for the Danube River
01.03.2016 Plovput published new Electronic Navigational Charts for the Sava River
22.03.2016 Plovput published second edition of navigational chart for the Danube River
03.08.2016 Plovput published new situational plans of critical sectors for navigation on the Sava River
13.09.2016 At critical sector Futog fairway dislocated and narrowed
17.09.2016 New Electronic Navigational Charts for the Sava River
30.09.2016 5.7 million tons of cargo transported by waterways in the first 6 months of 2016
09.12.2016 New functionality of Navigational Bulletin available to waterway users
13.02.2017 Plovput published the third edition of Navigational Chart for the Danube River
07.11.2018 Study visit of the cadets of the Military Academy of the University of Defence
14.06.2017 Waterway marking system on the construction site of new bridge on the Sava River updated
14.07.2017 Plovput published Navigational Chart of the Sava River adjusted for printing
14.07.2017 New Electronic Navigational Charts for the Sava River
03.11.2017 With the sediment dredging navigation conditions at critical sector Kamičak on the Sava River enhanced
25.12.2017 Relocation of the fairway at the Futog critical sector
22.05.2018 Changes of available dimensions and dislocation of the fairway on the critical sector Futog
06.08.2018 Changes of available dimensions and dislocation of the fairway on the critical sector Futog
13.09.2018 Beginning of the works execution under the project "River Training and Dredging Works on critical sectors on the Danube River"

RSSPlovput FacebookPlovput TwitterPlovput InstagramPlovput Youtube


download documents

Informer

Photo Gallery

newsletter



Stakeholders' Forum

Danube Glossary 2019




Danube Stream